Installation and commissioning

We deliver the set, put it in place, run the fuel and exhaust, earth it, connect it to the switchboard and start it. It is handed over running under real load, with your staff trained on it.

Installation and commissioning — Emergency Service 112

What’s included

  • Site survey and sizing, free of charge

  • Delivery and positioning

  • Fuel system, exhaust and earthing

  • Connection to the switchboard and the ATS

  • Commissioning and a test under load

  • Operator training at handover

How it works

  1. We survey the site and list what has to run.

  2. A written quote: the set, its build, the ATS and the works.

  3. Delivery and installation.

  4. Start-up, a test under load, and handover with training.

Questions

Didn’t find your question? Contact us →

  • How do I know what power I need?

    Send us the load list: what has to keep running and what can drop. We size from starting currents, not from nameplate totals, because motors, lifts and compressors draw several times their rated current at start. A site survey is free. Contact us →

  • Open, canopied or container?

    Open sets go indoors in a plant room. Canopied sets stand outside and cut noise to the level a site next to housing can live with. Containers are for remote sites and large power, and carry their own fuel, ventilation and service space.