Installation and commissioning
We deliver the set, put it in place, run the fuel and exhaust, earth it, connect it to the switchboard and start it. It is handed over running under real load, with your staff trained on it.

What’s included
Site survey and sizing, free of charge
Delivery and positioning
Fuel system, exhaust and earthing
Connection to the switchboard and the ATS
Commissioning and a test under load
Operator training at handover
How it works
We survey the site and list what has to run.
A written quote: the set, its build, the ATS and the works.
Delivery and installation.
Start-up, a test under load, and handover with training.
Questions
Didn’t find your question? Contact us →
How do I know what power I need?
Send us the load list: what has to keep running and what can drop. We size from starting currents, not from nameplate totals, because motors, lifts and compressors draw several times their rated current at start. A site survey is free. Contact us →
Open, canopied or container?
Open sets go indoors in a plant room. Canopied sets stand outside and cut noise to the level a site next to housing can live with. Containers are for remote sites and large power, and carry their own fuel, ventilation and service space.